Booster Pump Station and PRVs Installation

SECTORS:

WATER & WASTEWATER

CLIENT:

Logan Water

REGION:

QLD

STATUS

Complete

COMPLETION DATE:

As part of the Beaudesert Water Supply Augmentation Program, improvements are being made to the Beaudesert Water Treatment Plant, including the construction of 2 new storage reservoirs. 


Vaughan Infrastructure was engaged for the construction a new water booster pump station and installation of new pressure reducing valves (PRVs). 


Scope of works included: 


  • Construction of a water booster pump station at WPS062, housing 3 new 220l/s pumps and a flow meter. 

  • Integrated 2 new tees into the existing DN375mm trunk watermain to supply the booster pump station. 

  • Developed a 90m DN375mm water main from the existing trunk into the pump station. 

  • Established a fully enclosed, secured 10m x 6.5m water booster pump station building. 

  • Connected the newly constructed pump station into the existing concrete driveway area for ongoing access and ease of maintenance. 

  • Rehabilitated the existing area to blend in with the natural bushland setting.