Elizabeth Drive – DN250 High Pressure Gas Main & HDD Works
SECTORS:
GAS & FUEL
CLIENT:
Jemena
REGION:
NSW
STATUS
Complete
COMPLETION DATE:
Scope of works:
Trench, HDD and install 1,200 meters of DN250 high Pressure Gas Main
HDD Design and Construct Works
HDD Frack Out management plans and mitigation measures
HDD Bore and install DN250 Secondary Main along Elizabeth Drive
Excavate Trenchless Entry and Exit Pits
Responsible for HDD design and relevant document including but not limited to:
HDD drawing;
HDD Under Bore Plan;
Geotech Report to inform design and mud mix;
Bore Monitoring Plan;
HDD Analysis;
Epoxy coating application;
Pre/Post Dilapidation Report;
Frac-out Management Plan;
Stringing and welding of FBE pipe including supply and fitting of Dirax Sleeves;
Provide Bore Logs and As-Built HDD drawing; and
Backfilling of Entry and Exit Pits and repairing all nature strips.