Parramatta Light Rail Utilities Relocation
SECTORS:
CIVIL & STRUCTURES
CLIENT:
CPB Contractors
REGION:
NSW
STATUS
Complete
COMPLETION DATE:
Vaughan Infrastructure was awarded multiple contracts for the Parramatta Light Rail project. We developed innovative design solutions and championed program and cost-efficient solutions with asset owners. We provided close management of non-contestable works including design issue resolution and resource program management.
Vaughan Infrastructure also completed the installation of piles and pile caps for the smart pole installation across the project, in additional to the TCS works at key intersections. Our strategy was to focus on the successful management and integration of project participants and interfaces. We allocated experienced project managers who were specialist in such civil works and excellent team leaders, collaborators, and communicators. They ensured planning was continuously occurring and that communications was regular across the project team. They adopted a transparent and front-end issue identification approach.
Vaughan Infrastructure has an incorporated integrated management system across the organisation which integrates quality, work health & safety and environmental practices. It enables us to meet and exceed our client’s expectations.
Scope of works included:
10+ traffic switches completed over 1.2km on arterial RMS roads, including TSC works, asphalting, landmarking, and barrier install
Relocation and commissioning of circa 11km of existing utilities such as trunk water and sewer mains, high pressure gas lines, high voltage cables and major fibre routes throughout Macquarie and Eat Street, Parramatta CBD.
Working in and disposal of asbestos, restricted and hazardous up to 2000m3
Installation of 5.5km storm water up to DN1350, box culverts, 190 precast and 55 FRP pits
125 plus piles and pile caps works
Traffic Signal Works
125 Street light and smart pole construction
2km Kerb and Gutter, including pram ramps, laybacks and driveways
Piles and head stock for footbridge
4000 m2 of footpath construction
4800 of RMS flexible road pavement construction, RMS 209 specification
CSR of 3km of route
Works staged over multiple 56 hour mid-week and weekend shutdowns