Redbank Plains Water Booster Pump Station
SECTORS:
WATER & WASTEWATER
CLIENT:
Urban Utilities
REGION:
QLD
STATUS
Complete
COMPLETION DATE:
A new major water pump station which supplies to Redbank Plains, the Ripley Valley, the Swanbank industrial area and beverage giant Frucor Suntory’s new manufacturing facility in Redbank Plains, QLD, which was completed in 2024.
Scope of works:
Construction of Booster Pump Station including all architectural finishes, structural and civil works
Supply, fabrication, and installation of pipe supports and structural steel
Supply and installation of the flow meter pit and associated pit pipework
Supply, fabrication, and installation of the flow meter pit access ladders
Cut and fill operations including bulk earthworks, importing suitable fill material, material removal as required and soil compaction
Survey detail following bulk excavations, cut / fill and compaction operations
Excavation in preparation of concrete slabs, pad footings, trenching / excavation in preparation for pipe laying and thrust block installation
Supply, fabrication, and installation Mt Juillerat Drive Non-Return Valve Chamber Pit access ladders
Supply, fabrication, and installation of Mt Juillerat Drive Non-Return Valve Chamber Pit pipe supports nominated by Downer on the provided drawings
Supply and installation of Boundary Valve on Mt Juillerat Drive along watermain RS534329\
Landscaping finishes
Control and telemetry systems installed and configuration
Emergency duty programmable logic controller (PLC) independent of the RTU as back up to the RTU
Coordinate the inspection, testing and commissioning of the pump station