Rozelle Interchange Stage 3B

SECTORS:

CIVIL & STRUCTURES, POWER & ENERGY

CLIENT:

John Holland

REGION:

NSW

STATUS

Complete

COMPLETION DATE:

Vaughan Infrastructure completed some of the most complex stormwater components on the project and also installed the ITS network both in ground and through bridges, including installation of piles and gantries. All works were completed to RMS standards. 


Scope of works included: 


  • Design of the ITS backbone across Iron Cove Bridge 

  • Installation of 2km storm water up to DN900, 93 precast and 10 FRP pits across 5 stages of the project 

  • Vertical stormwater piping and structure installed at Victoria Road Bridge 

  • 1.3 km of ITS Backbone, 75 pits installed 

  • 665m of galvanized piping installed across Iron Cove Bridge

  • 17 piles and pile caps for light and sign post, piles include bored piles and CFA piles 

  • Services installation including water, sewer, fire and comms. 

  • Commissioning of ITS system 

  • 3 wayfinding sign installation 

  • FRP of retaining wall 30m long x 8m high with stone cladding finish and pits 

  • 500m Kerb and Gutter, including pram ramps