Wilton Southeast Pipeline Protection Program

SECTORS:

GAS & FUEL

CLIENT:

APA Group

REGION:

NSW

STATUS

Complete

COMPLETION DATE:

Awarded the contract as the Principal Contractor for the Pipeline Protection Works project in Wilton. 


Scope of works include: 


  • Installation of 1468m of concrete slabbing for the Moomba Sydney Ethane Pipeline (Ethane DN200) 

  • Installation of 735m of concrete protection slabbing for the Moomba Wilton Pipeline (MSP Natural Gas DN850) 

  • Integrity check and recoating of the Moomba Wilton Pipeline (MSP Natural Gas DN850) under 3 new road crossings and 2 other known defect locations – 82.5m worth (Coating (Coal Tar Enamel) removal 

  • Visual Inspection 

  • 100% MPI of the entire pipe exposed surface 

  • Abrasive Blasting 

  • Recoating 

  • Transition/coating interface with existing 

  • Final Coating Inspection